Location: San Diego, California
Utility Type: Water
Project Scope
- Replaced 3,250 feet of 20″ cement mortar-lined steel pipe
- Enhanced structural integrity with six double-ball flex joints
- Constructed 60 linear feet of 22″ cored sections, many exceeding 9 feet in depth
- Installed 400 specialized pipe rollers (280 at 24″ and 126 at 18″)
- Removed and replaced 240 existing median sections with modern reinforced medians, following thorough asbestos abatement, to ensure longevity and safety



Previous
Next
Project Details
This complex infrastructure project involved the meticulous removal and replacement of critical water lines across three bridges the North Ingraham, South Ingraham and Glenn Rick utilizing our advanced equipment and engineering expertise.