Doe River Project

Location: Tennessee
Utility Type: Utility Install

Project Scope

  • Piping Systems: Installed two parallel runs of 12″ restrained joint ductile iron pipe paired with expansion joints each spanning 450 linear ft.
  • Support Structure: Implemented 16 pipe hanger systems, including seismic restraints and custom lateral bracing to ensure stability against environmental factors.
  • Bridge Modifications: Executed critical modifications to two (2) bridge abutments and seven (7) diaphragms to enhance structural integrity.
  • Encasements: Integrated an 18-inch steel encasement along with necessary appurtenances at concrete aprons.

Ready to discuss your
construction project?