Replacing and upgrading critical water lines across three bridges, our team ensured long-term durability while integrating advanced pipe rollers and reinforced median sections.
Navigating tight spaces, we expanded and rerouted the electrical grid while maintaining seismic integrity—demonstrating precision and under-bridge expertise.
A complex utility installation requiring precise conduit runs, custom supports, and structural reinforcement, all delivered with meticulous attention to safety and performance.
From installing parallel ductile iron pipes with seismic restraints to modifying bridge abutments and diaphragms, our team ensured structural stability and reliable utility delivery.
Critical water infrastructure installation, including ductile iron pipe supports, flex hose assemblies, and precise fittings, completed efficiently in a single mobilization.
Provided under-deck utility installation along University Avenue in San Diego, ensuring reliable telecom and water infrastructure in a high traffic urban corridor.
Completed under-bridge utility construction on the historic Ross Island Bridge, delivering safe and efficient infrastructure upgrades to support Portland’s transportation network.